Today I was able to talk to the contractor and he was able to get the rest of the garage slab and most of the driveway. It appears that they are unable to work on from the sidewalk to the street so that is still in place. I was told that it was something that I would need to go through the city to do.
It turns out I was lucky enough to get the masons to come out and get their work started. When I got home they were working on framing and wiring the garage slab. It looks pretty cool how it is setup, it also looks like they put in the conduits for the electrical and what I want to run later. Though I am not sure how that is going to work the way they did it, as I was assuming it would go straight into the basement. I guess I will find out soon enough. I think this is going to be all for the week as it is suppose to rain, though there might be something they might try to do yet.
Here some pictures of the site.
Here is an after of the driveway, probably should have did a better picture of the before. But it definitely needed some work.
I thought it was kind of interesting how they keep the iron rods in place. They have what look like twist ties.
Here are a couple pictures of the conduits, from the garage and what was against the house.