Building Day 10

Submitted by wafy on

I am off a day, this should have been put in yesterday. The inside is ready for inspection from what I have been told and the eletricians came and put in some boxes for some outside lights and outet. I also got a new pile of gravel so I might eventually have a driveway to park on, as of today it is still sitting there. 

Yesterday I decided to take the day off so I could talk to the electrician about putting in conduit for the other cables that I will be running later. That unfortuantly didn't happen. I figured since they didn't show up at ten or so I figured it would run up and get some running done and maybe see if I can get some advice from the big box stores. No such luck, just got the running done. I was back with in the hour and I found the friend of the contractor working finishing the inside up for inspection. It turned out the eletrician just came and put the boxes on the outside and didn't even work on the inside. In fact they just left about 15 minutes before it got there. So I didn't get my information, I think I am just going to have to figure it out myself or wait until they actually put in the wiring. So far what I have learned from some other people I don't have much to worry about, but I still want to make sure I do it right. That is the whole reason for having other people do it for me that have more experience than I do in these matters. Oh well lift goes on.

Here is the side outlet. I asked the before to put the outlet a bit closer to the door or window than right next to the pond. Where it is at will work, just annoying.

Here are a couple picutures of the inside. The left picture you see some panels that were put in, I am not sure what they are for. The other picture is of the future attic access frame.